APM.CTRL_TIME - APMonitor Option

Main.OptionApmCtrlTime History

Show minor edits - Show changes to output

June 08, 2017, at 11:24 PM by 10.5.113.159 -
Changed lines 5-6 from:
%width=50px%Attach:apm.png
to:
%width=50px%Attach:apm.png [[Main/DbsGlobal|Global Options]] | %width=30px%Attach:fv.png %width=30px%Attach:mv.png %width=30px%Attach:sv.png %width=30px%Attach:cv.png[[Main/DbsVariable|Local Options]]
Added lines 12-13:

See also [[Main/OptionApmCtrlHor|CTRL_HOR]], [[Main/OptionApmPredHor|PRED_HOR]], [[Main/OptionApmPredTime|PRED_TIME]]
June 01, 2017, at 06:55 AM by 45.56.3.173 -
Added lines 1-11:
(:title APM.CTRL_TIME - APMonitor Option:)
(:keywords APM.CTRL_TIME, Optimization, Estimation, Option, Configure, Default, Description:)
(:description Time for each step in the control horizon:)

%width=50px%Attach:apm.png

 Type: Floating Point, Input or Output (with CSV read)
 Default Value: 60
 Description: Time for each step in the control horizon

CTRL_TIME is the cycle time of the controller for real-time applications. The clock time trigger for initiating successive controller solutions should be synchronized with CTRL_TIME to avoid dynamic mismatch between the internal simulation time and the process measurements. When CSV_READ is on and the horizon time points are specified from the data file, the CTRL_TIME and PRED_TIME are set equal to the time increment of the first time step.